Progress Shots
-

- Grading the Main House
-

- 1st Floor sliding door near kitchen
-

- 2nd floor bathroom #2 with tile being laid
-

- 2nd floor master suite with bath and walk through closet
-

- 2nd floor bedrooms and closets
-

- 3rd floor
-

- Kitchen on 1st floor
-

- 0 – Basement walk out level with full bath
-

- 0 – Basement walk out level with full bath
-

- 0 – basment utility and tool room
-

- South facing deck during lawn reseeding
-

- Reseeding the grass around the house
-

- 1st Floor Kitchen
-

- Shade Porch with cedar interior trim
-

- Main House South Side with deck
-

- Insulation of the Main House
-

- Insulation of the Main House
-

- Delivery of Stone for the Main House Landscaping
-

- 1st Floor Interior looking east
-

- Insulation drill holes
-

- South Side of the Main House
-

- Platt on the screen porch
-

- Construction Pictures
-

- Construction Pictures
-

- Septic Repair
-

- Main House
-

- Main House East Side
-

- Reseeding the grass around the treehouse
-

- 0 – basment view out the walk out
-

- Exterior from Southwest
-

- Exterior view from North
-

- Tulip Tree